2019-03-08 Dematic Recurring Meeting notes

2019-03-08 Dematic Recurring Meeting notes

Date

Mar 8, 2019

Participants

  • @Cynthia Schwarz (Unlicensed)

  • Gautam

  • @Nancy Turner

  • @Margery Sly (Unlicensed)

  • Larry

  • Bill

  • @Justin H. Hill

  • @Chin U. Kim

  • @John Oram

  • @Holly Tomren

  • Kevin

Goals

  • EMS - Alma connection

  • User Accounts

  • Workstation setup

  • System Acceptance Test and System Acceptance Test Plan

  • OpNet laptop

  • Results of end-to-end simulation testing

  • Timeline Review

Discussion topics

Notes

Notes

EMS - Alma Connection

  • This is resolved.

Users Accounts

  • They’re all done.

  • Chose not to load onto server because not sure if he’ll have to delete the database and rebuild

  • Need to have a quick meeting next week - the fact that students may be working on their own changes some of the security - allow them to view screens - Schedule for the week of the 18th: Wednesday-Friday

Workstation Setup

  • Two are done and rest should be done by the 15th

  • Cables have been received

  • Gautam sent out the printers

  • Monday 3/18 at 2:30 - Deliver - use recycling bin

  • List of items to deliver:

    • Computer CPU (6)

    • Monitors (6)

    • Barcode scanners (6)

    • Receipt printers (6)

    • cables; display port and monitor power (5)

    • temporary tables (2); one for ASRS chamber for Gautam to use during visit, one for Unit Load workstation

  • Tuesday 3/19 at 2:30 - workstation installations

  • Equipment for installation:

    • Step ladder

    • Screw driver

System Acceptance Test/Plan

  • End of installation

  • Dematic will run a test. Temple will witness the test.

  • Take the Functional Acceptance Test and add any other scenarios that we want

  • Starts a 60 day window before acceptance is complete

  • Temple will discuss timeline offline and report back

OpNet Laptop

  • No restrictions for installing

  • no updates

End-to-end

  • no major issues with Alma/EMS

  • we did identify some UX/UI changes needed for Blacklight. I will meet with dev team offline to discuss further.

Timeline Review

3/12: End-to-end testing simulation for Unit Loads and review of record display for unit load items

3/15

  • Deadline for having the ASRS mezzanine painted and floors sealed and space locked

  • will need a table/desk set up in the UL loading area

    • locate a small folding table that we can bring over until permanent furniture arrives

    • take a second table over for Gautam to work at while he is there

  • Larry will arrange for a temporary AP for the ASRS area during Gautam’s visit

  • Deadline for having workstations configured

3/18 @ 2:30pm: Deliver workstations to Charles

  • List of items to deliver:

    • Computer CPU (6)

    • Monitors (6)

    • Barcode scanners (6)

    • Receipt printers (6)

    • cables; display port and monitor power (5)

    • temporary tables (2); one for ASRS chamber for Gautam to use during visit, one for Unit Load workstation

  • Who will deliver:

    • Cynthia

    • Chin

    • John Pyle will assist us with the tables for Special Collections and Gautam

  • How will they be delivered

    • The best way may be the large green recycling bins - the ones with the large wheels

3/19 @ 2:30pm : Install workstations in Charles - both unit load and mini loads

  • installation equipment

    • Step ladder

    • philips head screw driver

3/20-22

  • Gautam can test the connections between the pick stations and the servers

  • move test load materials to Charles

3/25

  • Gautam on site

  • Verify workstation setup and do any connection testing

  • Initial 1000 record move from Alma to EMS

    • Monitor Alma system performance

3/26 - 3/29: Test load of physical materials both into ML and UL

  • Gautam leaving Friday afternoon at 3:30 - so no work on Friday afternoon

4/1

  • Gautam on site

  • catch up on any miscellaneous items from previous week

4/2: Operational training - mini loads

4/3: operational training - unit loads

4/4: End-to-end testing of the ML

4/5: End-to-end testing of the UL

4/9 - 4/11: Maintenance training on the Mini Load aisles

4/12: Make up maintenance training on Unit Load

5/9: Begin Alma record load to EMS

5/13??: Start loading ASRS

Action items

Cynthia will schedule a meeting with Gautam to discuss user roles/permissions 3/20-22
Cynthia will follow up with Curtis to get a bin or hand truck with appropriate wheels for moving equipment across the street

Decisions