2019-06-14 Dematic Recurring Meeting notes

2019-06-14 Dematic Recurring Meeting notes

Date

Jun 14, 2019

Participants

  • @Cynthia Schwarz (Unlicensed)

Goals

  • OpNet Updates

  • Access to Support Portal

  • Access to additional documentation - flash drive from Bill Barnes?

  • Update on Diacritics

  • Print Slips Testing

  • UL issues with the mat sensors - Update

  • User Logins using Active Directory

Discussion topics

Notes

Notes

OpNet Updates

  • I have these instructions and can update the flash drives whenever we’re ready.

Access to Support Portal - This is done.

Access to additional documentation

  • Bill Barnes dropped off the documentation

  • Chin uploaded to Google Drive.

  • Cynthia will put a link into Confluence space

Update on Diacritics

  • System cannot handle that right now because the way that SQL server has been setup does not support special characters.

  • Dematic is not planning on making any changes because they would have to modify each and every table in the system.

  • About 20% of our 1.2 million records could be affected by this. However, we rarely use the title/author field.

Print Slips Testing

  • Gautam can put a new file on the server so that we can test.

  • We would need to do one or two picks to see what the print slips look like

  • Looking at middle-end of July for working on this

UL outstanding issues

  • Dealing with a new shuttle issue that might be partially caused by dust in the shuttle

  • Mat sensors are resolved

  • Location of racks has also been resolved

  • The who system is sounding different. Had an issue where the container was blocking the sensor and container wasn’t coming in straight to the pick station. This could be the result of dust.

  • There was a full bin error - likely because of the sensors - Margery was able to take care of this.

    • Reconciled empty locations - there were two locations that should have had containers, but there were no containers - Gautam had to delete those two containers so the system was in sync.

    • Instead of two shuffle locations, we now have three shuffle locations.

ML outstanding issues

  • SRM 1 is in estop - there are a bunch of failures - have a call in to support.

  • Finding bins that are bushed in too far - and these are above where the cleaning happened. Have to mark the bins as unavailable. More than 3 per aisle

User Logins using Active Directory

  • Revisit in the middle-end of July for this

  • We will need the name of the server

  • will need to create the exact same named roles in active directory

Access issues to the building

  • got rid of all temporary power - will be going in on Saturday to pull all of the temporary power out.

  • We’ve gotten about a third of the way there.

Misc

  • Gautam will be on vacation from July 1-12. Will not be available on Fridays any further.


Next Meeting: Touch base via email after July 15.

Action items

Decisions